CD-26 · Rev 1.0 · Sheet 1 of 3
Document Replacement & Case Tracker
This is the sheet-only HTML view. Inspect it in the browser, then print this page. No PDF download is required.
Browser-menu fallback: If the print button does not work or JavaScript is disabled, use your browser's Print command (Ctrl+P / Cmd+P). This page contains only this one printable sheet.
BUILT TO RESIST · CIVILIAN CONTINUITY DESKCD-26 · SHEET 1 OF 3
Document Replacement & Case Tracker
When records are missing, the work becomes procedural: identify the issuing office, preserve proof, obtain a case number, note fees and deadlines, and keep every receipt and response. This tracker keeps replacement work from disappearing into phone calls and portals.
Replacement register
| Record | Issuing office / custodian | Case / reference no. | Proof required | Requested | Deadline / ETA | Status |
|---|---|---|---|---|---|---|
CD-26 · Rev 1.0 · 2026-10-03 · builttoresist.com/continuity-desk/