CD-40 · Rev 1.0 · Sheet 1 of 2
Facility Reopening & Handoff Verification
This is the sheet-only HTML view. Inspect it in the browser, then print this page. No PDF download is required.
Browser-menu fallback: If the print button does not work or JavaScript is disabled, use your browser's Print command (Ctrl+P / Cmd+P). This page contains only this one printable sheet.
BUILT TO RESIST · CIVILIAN CONTINUITY DESKCD-40 · SHEET 1 OF 2
Facility Reopening & Handoff Verification
Reopening should mean more than unlocking the door. Confirm utilities, life safety, accessibility, staffing, records, communications, sanitation, supplies, public notice, unresolved hazards, and who accepts responsibility for the next operational period.
Facility / service
Facility / service point
Address / area
Function
Closed since
Proposed reopen / handoff time
Responsible organization / role
Readiness checks
| Check | Verified by | Date/time | Status / limitation |
|---|---|---|---|
| Life safety / fire / exits | |||
| Water / sanitation | |||
| Power / temperature / lighting | |||
| Accessibility / mobility access | |||
| Communications / public contact | |||
| Staffing / role coverage | |||
| Records / systems access | |||
| Supplies / waste handling | |||
| Known hazards / restricted areas |
CD-40 · Rev 1.0 · 2026-10-03 · builttoresist.com/continuity-desk/